L+R Airport Consulting was engaged by Moorabbin Airport Corporation to provide aviation inputs to the Moorabbin Airport Master Plan 2015 and 2021.
In each case our scope included the following components:
Airport Activity and Growth Forecasts based on the airport operators stated business growth aspirations and expected success in driving aviation activity at Moorabbin.
Airfield Capacity and Future Needs Study to confirm appropriate long-term planning assumptions, and identify future runway and taxiway system requirements, and aircraft parking areas.
Aviation Support Services and Facilities Study to determine requirements for ancillary infrastructure and facilities to support growth aspirations
Airport Aircraft Operations, Flight Tracks, Noise Strategy and Management Plan, incorporating the preparation of a new Australian Noise Exposure Forecast (ANEF) together with N-above contours based on a detailed assessment of the ultimate airport capacity taking into account airspace capacity limitations.
Identification and mapping of obstacle limitation surfaces (OLS) and PANS-OPS surfaces requiring protection from obstacle intrusion, for designation as the future Prescribed Airspace for the airport.